coe-staff: MAR 24 Power Transfer Switch Testing Notice

Eric Owens eowens at uoregon.edu
Tue Mar 24 08:15:17 PDT 2015


All-

Campus Ops has successfully completed the testing as outlined below.  All systems are back on normal electrical service.

Thank you for your cooperation.

Eric



From: Eric Owens
Sent: Monday, March 23, 2015 1:46 PM
To: coe-staff at lists.uoregon.edu
Subject: FW: MAR 24 Power Transfer Switch Testing Notice



From: Eric Owens
Sent: Friday, March 20, 2015 10:14 AM
To: coe-staff at lists.uoregon.edu<mailto:coe-staff at lists.uoregon.edu>
Subject: RE: MAR 24 Power Transfer Switch Testing Notice


From: Eric Owens
Sent: Thursday, March 12, 2015 7:15 AM
To: coe-staff at lists.uoregon.edu<mailto:coe-staff at lists.uoregon.edu>
Subject: FW: MAR 24 Power Transfer Switch Testing Notice

All-

Please see below the notification from Campus Ops for electrical transfer switch testing at HEDCO on Tuesday March 24 between 7:30am-8:30am.  Having been through this specific testing for three years now, we do not expect any interruption in service.  However, as a precaution, we suggest turning off all electronic devices such as computer and printers the evening prior  to the testing.  While the testing is scheduled to between 7:30am-8:30am, we will most likely be done by 8am and will notify the occupants shortly thereafter.

I will send out a reminder of this event on Monday March 23.

Feel free to contact me if you have any questions or need additional information.

Thanks,
Eric

Eric H. Owens
College of Education Complex Manager
Office of the Dean
P: 541-346-1474
C: 541-731-2843
Office 307A HEDCO
[cid:image001.gif at 01CE1104.B9070730]



From: Debbie Cadigan
Sent: Wednesday, March 11, 2015 12:41 PM
To: Amy Hughes Giard; Cathy Kraus; Cathy Method; Chicora Martin; Joan Nelson; Cleven Mmari; Debbie Turetzky; Eric Fullar; Erin Driscoll; Hilary Gerdes; Holly Syljuberget; Jackie Etchison; Jennifer Burton; Karla Nelson; Kelly Wolf; Keri Baker; Lori Manson; Marilyn Linton; Micah Sardell; Michael Thompson; Michelle Brown; Nancy O'Brien; Rebecca Lynn; Sandi Gussenhoven; Sue Eveland; Susan Stumpf; Terrie Minner; Connie Manley; Eric Owens; Jeff Woodbury; Joshua Harris; Josna Lauryan Lewis; Ken Loge; Lalla Pudewell; Leslie Stephenson; Lindsay Elliott; Melissa Finch; Bruce Bowerman; Chris Q Doe; Daniel Graham; Eric Johnson; Eric Selker; George Sprague; Jessica Stark; Kim Newell; Kryn Stankunas; Monte Matthews; Shelley Elliott; Steve Stuckmeyer; Susan Scott; Sylvia Banks; Tory Herman; Frank Sharpy; Stephanie Bosnyk; Arlene Deyo; Autumn Wicklund; Brendan Bohannan; Christi Mabinuori; Donald Elting; Doug Blandy; Frank Vignola; Julie Haack; Lara Nesselroad; Leah O'Brien; Michael Haley; Michael Koscho; Michael Smith; Michelle Cottrell; Michelle Wood; Patty Smith; Patty Valenzuela; Paul Keats; RaDonna Koble; Rob Thallon; Roger Leonard; Sara Nash; Stephen Kevan; Douglas Hodson; James Bailey; Manuel Balesteri; Nancy Slight-Gibney; Tim Erickson; Josh Chadwick; Kurt Neugebauer; Richard Ebert; Ryan Stasel; Sue Varani
Cc: Rob Berg
Subject: MAR 24 Power Transfer Switch Testing Notice


March 11, 2015

MEMORANDUM

TO:                THE BUILDING USERS OF:  Oregon, HEDCO, Streisinger, Lillis, Onyx, Knight Library, JSMA, Allen

FROM:           Debbie Cadigan, Campus Relations Manager, Campus Operations

SUBJECT:     Standby & Life Safety Power Transfer Switch Testing

On Monday, Tuesday, Wednesday, March 23rd, 24th, 25th a contractor will perform our annual ATS (Automatic Transfer Switch) testing on the life safety and standby power transfer switches in your building. Your building will be tested March 24th. See schedule below for specific times.

The contractor transfers from normal power source to standby and then back. There is a possibility of a small blip on the standby power of no more than 10 seconds when the transfer occurs each way. Normal lighting and power is not tested and should not be affected unless it's inadvertently tied into the standby power.

Life safety transfer switches can affect emergency lighting in stairwells, hallways and the fire doors may close, although they will continue to operate manually. Fire panels will continue to operate and will be re-set after testing and the fire doors will be re-opened.

If you have any questions, please feel free to contact Rob Berg, Electrical Supervisor, Campus Operations, at ext. 6-2313 or rberg at uoregon.edu<mailto:rberg at uoregon.edu>.

Thank you.
ATS Testing

23-Mar

University Health

6:00-7:30am

Knight Law and Ford Alumni

7:30-9:00am

Global Scholars

9:00-10:30am

LISB

10:30-12:00pm

Lunch

12:00-1:00pm

Lawrence and Willamette

1:00-2:00pm

Fenton and McKenzie

2:00-3:30pm






24-Mar

Oregon Hall

6:00-7:30am

HEDCO

7:30-8:30am

Streisinger

8:30-9:30am

Lillis

9:30-11:00am

Onyx

11:00-12:00pm

Lunch

12:00-1:00pm

Knight Library and JSMA

1:00-2:00pm

Allen

2:00-3:30pm


25-Mar

Living Learning Center

6:00-7:30am

Music

7:30-8:30am

PLC and Mac Court

8:30-9:30am

Huestis

9:30-11:00am

Pacific and Cascade

11:00-12-00pm

Lunch

12:00-1:00pm

Knight Law and Ford Alumni

1:00-2:00pm

UOPD and Rainier

2:00-3:00pm

Baker Downtown

3:00-4:00pm


-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists-prod.uoregon.edu/pipermail/coe-staff/attachments/20150324/8f67096a/attachment.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image001.gif
Type: image/gif
Size: 2641 bytes
Desc: image001.gif
URL: <http://lists-prod.uoregon.edu/pipermail/coe-staff/attachments/20150324/8f67096a/attachment.gif>


More information about the coe-staff mailing list