coe-staff: FW: AUG 21 Transfer Switch Testing
Eric Owens
eowens at uoregon.edu
Wed Aug 20 16:16:08 PDT 2014
All-
See below in regards to additional electrical testing at HEDCO. After further review and discussions with Campus Ops, we do not believe that we will experience any interruption in service but are taking precautions in the event of a power loss.
I will send out an email upon completion of the testing.
Thanks,
Eric
Eric H. Owens
College of Education Complex Manager
Office of the Dean
P: 541-346-1474
C: 541-731-2843
Office 307A HEDCO
[cid:image001.gif at 01CE1104.B9070730]
From: Debbie Cadigan
Sent: Wednesday, August 20, 2014 3:08 PM
To: Alayne Switzer; Hal Sadofsky; Lara Nesselroad; Michael Price; Bill Chandos; Brook Muller; Brooke Freed; Edward Teague; Jen Lambert; Joshua Harris; Karen Bankole; Michael Smith; Rob Thallon; Steve Stuckmeyer; Richard Ebert; Ryan Stasel; Sue Varani; Brooke Cagno; Cathy Soutar; Charlotte Nisser; Christopher Blum; Jared Lindman; Julia Heydon; Kalindi Devi-Dasi; Kim Lilley; Kristina Mollman; Marilyn Reid; Melissa Gustafson; Shelley Carlson; Susan Dickens; Teri Rowe; Tish Ramey; Carol Fernlund; Connie Manley; Eric Owens; James Jacobson; Jeff Woodbury; Josna Lauryan Lewis; Lalla Pudewell; Lindsay Elliott; Melissa Finch; Terry Kneen; Brad Foley; Ceci Lafayette; David Mason; Laura Littlejohn
Cc: Rob Berg
Subject: AUG 21 Transfer Switch Testing
Importance: High
Below is the update from this week's power transfer switch testing. Rob Berg, our Electrical Supervisor has spoken with key building contacts in these buildings.
21-Aug
Fenton
6:00-7:30am
Lawrence
7:30-8:30am
Allen
8:30-10:00am
PLC
10:00-11:00am
HEDCO and Music
11:00-12:30am
On Thursday, August 21st a contractor will be performing required testing on the life safety and standby power transfer switches in your building.
This will mean circuits supplied by life safety and standby transfer switches will have intermitted outages during the allotted time. Testing will be within the time allotted and should not start earlier or go beyond.
Life safety transfer switches will affect emergency lighting in stairwells, hallways and the fire doors will close, although they will continue to operate manually. Fire panels will continue to operate and will be re-set after testing and the fire doors will be re-opened.
Normal lighting and power will not be affected
Questions, contact Rob at 1-541 580 1100 or 6-2313.
August 11, 2014
MEMORANDUM
TO: THE BUILDING USERS OF: FENTON, FORD ALUMNI CENTER,
HEDCO, KNIGHT LAW, KNIGHT LIBRARY, LAWRENCE, LISB,
MUSIC, PLC and WILLAMETTE HALLS
FROM: Debbie Cadigan, Campus Relations Manager, Campus Operations
Brett Rogers, Director of Facilities Services, Campus Operations
SUBJECT: Emergency & Standby Power Transfer Switches Testing
On Monday, August 18th a contractor will be performing required testing on the life safety and standby power transfer switches in your building.
This will mean circuits supplied by life safety and standby transfer switches will have intermitted outages during the allotted time. Testing will be within the time allotted and should not start earlier or go beyond.
Life safety transfer switches will affect emergency lighting in stairwells, hallways. Fire panels will continue to operate and will be re-set after testing.
Normal lighting and power will not be affected
If you have any questions, please contact Rob Berg, Facilities Electrical Supervisor, Campus Operations, at ext. 6-2313 or rberg at uoregon.edu<mailto:rberg at uoregon.edu>.
Thank you.
August 18th
Ford Alumni and Knight Law
6:30-8:00am
Life Safety
Rainier and Fenton
8:00-9:00am
Life Safety
Music
9:00-10:30am
Life Safety & Standby
HEDCO
10:30-11:30am
Life Safety & Standby
PLC and Knight Library
11:30-12:30pm
Life Safety
Lawrence and Willamette
1:30-2:30pm
Life Safety
LISB
2:30-4:00pm
Life Safety & Standby
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://lists-prod.uoregon.edu/mailman/private/coe-staff/attachments/20140820/44aed88f/attachment.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image001.gif
Type: image/gif
Size: 2641 bytes
Desc: image001.gif
URL: <https://lists-prod.uoregon.edu/mailman/private/coe-staff/attachments/20140820/44aed88f/attachment.gif>
More information about the coe-staff
mailing list